Environmentally Friendly Structural Steel Fabrication Modern Prefab Modular Shopping Mall Building Materials

1. Specification  VISTA - Specifications of Steel Structure BuildingItem NameMaterials CharacteristicsMaterial GradeSurface TreatmentColumnH shape, Box, Steel Pipe, Hot rolled sheetQ235B,Q345BPaint or Hot-dip GalvanizedBeamH shape, Box, Steel Pipe, Hot rolled sheetQ235B,Q345BPaint or Hot-dip GalvanizedBracingSteel Rod,

Featured Products

Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material

1. Specification 
 VISTA - Specifications of Steel Structure Building
Item NameMaterials CharacteristicsMaterial GradeSurface Treatment
ColumnH shape, Box, Steel Pipe, Hot rolled sheetQ235B,Q345BPaint or Hot-dip Galvanized
BeamH shape, Box, Steel Pipe, Hot rolled sheetQ235B,Q345BPaint or Hot-dip Galvanized
BracingSteel Rod, Steel Pipe, Angle SteelQ235B,Q345BPaint or Hot-dip Galvanized
PurlinC or Z purlins(Thickness1.8mm~3.0mm)Q235B,Q345BHot-dip Galvanized
Wall/Roof PanelsSingle colorful corrugated steel sheet, sandwich panels with EPS, Rock wool, PU, ALC panels, Steel skeleton panels, etc Galvanized Steel+PaintingAlu-zin 150g,Fluorocarbon pain
DoorSliding or Rolling doorSteel or Aluminum sheetPaint or Hot-dip galvanized
WindowsAluminum alloy-Glass, Aluminum alloy-shutterT=1.0-2.0mmAlloy
Skylight panelsFRP T=1.5mm-1.8mmCoefficient of thermal expansion:2.2x10-5/cmLight Tranmitar 85%
VentilatorTurbine ventilator on a ridgeSteel, Stainless steel, PCPaint or Hot-dip Galvanized
GutterGalvanized steel plate, Stainless steel plateT=2.0mmHot-dip galvanized
DownpipePVC pipe, color steel-pipe Y=0.5mmDia110mmpaint
Hight BoltOrdinary, High strength10.9S,4.8SHot-dip galvanized, Steel
Ground boltsSteel RodM24,M27,M30,M33,M39,M4210.9SSteel
2. Detailed Description

Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material
(1) Unique Characteristics 

1 - High quality and durability: 
The steel building is safe and reliable, and it can withstand severe environments such as fire, strong winds, and heavy rain.

2 - Faster construction: All the structure parts are prefabricated in the factory, and then installed at the construction site. As a result, it will save up to 50% time period of construction and save costs for building owners.

3 - Minimal maintenance: The exterior of a metal building is essentially maintenance-free and long-lasting. Steel does not support mold growth, resists rust and decay better than other building materials. The bottom line is that low maintenance costs lead to low operating costs - a huge benefit over time.

4 - Economical - Reasonable cost: This building form has lightweight and short construction period, thus it can be put into operation very soon. Its comprehensive economic benefits are better than concrete structure building.

5 - Environmentally friendly: The steel structure can be recycled, and it will cause less environmental pollution when being built or removed.

6 - Wide architectural possibilities: It is applicable to many industries and non-industries, such as manufacturing, agriculture and civil usage.

7- Delicate appearance: The steel building design is with a modern sense. The wall panels are available in multiple colors and the building structure is with high flexibility.

8 - Space flexibility: Larger spans for flexible interior design.

9 - Seismic Resistance: Extensive research confirms that steel structure buildings withstand significant earthquake and wind events. Watch a test building outlast earthquakes simulated at UC San Diego.

10 - Adjustable design: Can cater to future expansions (vertical and horizontal) 

(2) Why Choose Steel Structure


Steel Was A Stand By Material For A Long Time In The Architectural Framework, But When It Is Recognized For Its Natural Beauty And Structural Integrity, The Result Can Be Inspiring. Master Architects Such As Zaha Hadid, Frank O Gehry, And Moshe Safdie Have Challenged The Idea Of Using Only Steel To Construct A Skeleton Of The Building And Create Innovative And Surprising Fluid Structures. Many Modern Architects Are Experimenting With The Aesthetic Of Steel From Rust Texture To Polishing For A High Shine Finish. 

Basically Here, The Buildings Are Made Up Of Steel Frameworks Which Support All The Loads Where Columns, Beams, And Girders Are Made Up Of Steel Sections. They Are Flexible, Which Makes Them Very Good At Resisting Dynamic (Changing) Forces Such As Wind Or Earthquake Forces.


(3) Main Components
Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material

1 - Roofing System: It Blocks Rain, Snow, And Wind. Ensure A Comfortable And Dry Working Environment In The Workshop/Warehouse. 

2 - 
Composite Floor Deck: A Two-Story Or Multi-Story Building, Which Is Poured On The Floor Slab To Serve As A Formwork. Save Time And Improve Construction Progress. 

3 - 
Hallway System: We Can Provide Various Wall Partitions Of Different Materials. 

4 - Purlin: 
Support The Roof Sheeting And The Fixed Position Of The Roof Sheeting. 


5 - Finished Metal Siding And Flashing: Roof And Wall Are Covering Of Color-Coated Corrugated Steel Sheet Or Steel Sandwich Panel, Hot Dipped With Zinc And Aluminum Compound, That Is Fixed To The Outside Of The Structural Building To Protect It Against Bad Weather Or To Make It Look More Attractive And Last For Generations. 

6 - Painted Roll - Up Doors And Filler Panels: Easy Access. According To Customer Requirements, There Are Composite Panel Doors, Electric Shutter Doors And So On. 

7 - Support Post: Supporting Building. 

8 - Load Bearing Wall Assembly With Horizontal Partitions For Shear Walls: Supporting Building.  

Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material
(4)  Application 

Industry: Workshop, Warehouse, And Other Industrial Facilities. 

Commerce: Mall, Hotel, Exhibition Hall, Hospital, Office Building. 

Public: The Social Activity Center, School, Library, Sports Stadium, Church, etc. 
Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material

(5) Installation Process 

Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material


3. Steel Structure Process

3.1. Prepare Raw Materials
Cut Steel Plate Or Use Customized Size H Section Steel And Angle Steel, Round Tube, Round Steel, Square Tube, etc.

3.2. Assembly And Welding
Our Welders Will Follow The Drawings To Assemble The Steel Members And Weld Them Together As An Entire Beam/Column/Brace And So On; (Our Quality Inspector Will Check The Steel Pieces After Finish Welding, This Is The First Quality Check)

3.3. Sandblast
After Finish Welding And Polishing, Our Sandblast Effect Can Reach Internation 2.5 High Grade, Very Good For Resisting Rust; (Secondary Quality Check)

3.4. Paint
Within 2 Hours After Sandblasting, All The Steel Members Should Be Painted. A Client Can Choose Any Color And Any Brand Of Paint. (The Third Quality Check)

3.5. Inspect The Goods By Client
After We Finish A Part Of Fabrication Work, We Will Invite Clients To Check The Goods Before We Pack The Steel Frame. 

3.6. Packing And Loading
If Clients Require Us To Load The Goods By Close Containers, We Will Pack The Steel Structure Members One By One On The Steel Skid And Tie The Whole Steel Package Well. (The Fourth Quality Check )
Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material

4. 
Quality Control & Safety for Steel building

Quality is the hallmark of the products designed and manufactured by us. 
We are an ISO 9001: 2000 certified company. Some of the quality practices followed by the company which has LED to continuous improvements in processes, procedures, and products are as follows: 

1) All products meet the national and international standard requirements. 

2) To ensure quality, all products are passed through stringent quality checks in all the stages of manufacturing. 

3) The source of the material is certified to ensure consistency in quality. Materials are procured from reputed suppliers and manufacturers and full traceability is maintained. 

4) Well established in-house QA Laboratory to ensure quality in different stages of manufacturing. A high-quality welding process and technology are used. Nondestructive testing on welding joints is carried out. Only branded and reputed consumables are used for manufacturing. 

5) The project quality department ensures end-to-end quality for its buildings during execution and completion. 

5. Market
OVERSEAS PROJECT - VISTA
No.Project NameBuilding Area (m²)Building Style Loctaion 
1US 3M Ltd.26,600 Steel StructureUS
2Three-story office building of Swfit motorsco.,ltd3,600 Steel StructureTanzania
3C&C Company Production Workshop 10,000 Steel StructureTanzania
4LA Company Warehouse in The Republic of South Africa 8,000 Steel StructureSouth Africa 
5Rwanda Warehouse3,000 Steel StructureRwanda
6A company workshop in Burundi2,600 Steel StructureBurundi
7Office building of a company in Tanzania4,300 Steel Structure & Curtain WallTanzania
8Tanzania Integrated Gas Station1,510 Steel StructureTanzania
9Tanzania 5 storey office building5,000 Steel Structure & Curtain WallTanzania
10Solomon Islands bauxite drying shed10,000 Steel StructureSolomon Islands
11French Polynesia Parking Lot3,660 Steel Pipe TrussFrench Polynesia
12Venezuelan Stadium4,200 Steel StructureVenezuelan
13Mexican Swimming Pool2,200 Steel GridMexico
14Pakistan Motor Exhibition Hall4,000 Steel Structure & Curtain WallPakistan
15Zambia Workshop4,600 Steel StructureZambia
16Nigeria Exhibition Hall6,000 Steel Grid & Curtain WallNigeria
17Nigeria Warehouse4,200 Steel StructureNigeria
18Mexican Overpass1,000 Steel StructureMexico
19Jamaican Chicken Farm5,600 Steel StructureJamaica
20Philippine Multi-level Parking Lot4,500 Steel StructurePhilippine
21Botswana Multi-storey Office Building8,000 Steel StructureBotswana
22Tanzania Three-story Office Building5,520 Curtain WallTanzania
23Nigeria Exhibition Hall3,800 Curtain WallNigeria
24Botswana Office Building16,000 Curtain Wall & Decorative Aluminum PlateBotswana
25Logistics Park3,200 Steel StructureQatar
26Qatar Farming Factory (Chicken House)5,000 Steel StructureQatar
27Poultry House2,000 Steel StructureTurkmenistan
28Multi-storey car park4,200 Steel StructureIraq
29Chicken Farm2,100 Steel StructureEgypt
30Warehouse3,600 Steel StructureYemen
31Cattle Farm2,600 Steel StructureIsrael
32Power Generation Platform5,000 Steel StructureBangladesh
33KADESH Chicken Farm1,600 Steel StructureIsrael
34New Workshop5,300 Steel StructureQatar
35Light Steel Structure Workshop and Office Building5,016 Steel StructureSaudi Arabia
36Light steel Structure Warehouse3,500 Steel StructureIraq
37Wooden Furniture Factory5,000 Steel StructurePakistani 
38Workshop3,300 Steel StructureUAE
39Uruguay Audi 4s Shop4,587 Steel StructureUruguay
40Ethiopian Factory Villa100,000 Steel StructureEthiopia
41Venezuelan Villa1,000 Steel Structure 
42Algeria Factory and Office20,160 Steel StructureAlgeria

Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material
6. Our Service


6.1 Pre-Sale Service 
  • Consultant Service(Answering Client's Questions)
  • Primary Design Plan(Free)
  • Assisting The Client To Choose A Suitable Construction Plan
  • Price Calculation
  • Business&Technology Discussion
6.2 Sale Service 
  • Submission Of Support Reaction Data For Foundation
  • Submission Of The Construction Drawing
  • Providing Requirements For Embedding
  • Construction Manual
  • Fabrication&Packing
  • Delivery
  • Other Requirements By Clients
6.3 Training For Assembly 
  • We Can Support You Full Training Service Of How To Construct And Assembly On-Site. 
  • Solution 1: If You Have Your Own Construction Team With Engineers, Plumbers, Electricians, And Supervisors, We Can Support You 2 Professional Technician For The Necessary Assembly Training On-Site. 
  • Solution 2: If You Don't Have A Construction Team, We Recommend You Employ Local Construction Workers For Assembly, We Can Support You All The Technician Engineer And Supervisor For Training And Construction Assist. But The Relevant Charges Will Be On Your Account. 
6.4 After-Sale Service 
  • Periodical Following-Up Our Client's Projects
  • Feedback And Good Communication
  • 50 Years Warranty For VISTA Steel Frame 

7. FAQ

7.1 What's The Quality Assurance You Provided And How Do You Control Quality? 
Established A Procedure To Check Products At All Stages Of The Manufacturing Process - Raw Materials, In-Process Materials, Validated Or Tested Materials, Finished Goods, etc. 

7.2 Do You Offer Guiding Installation On-Site Overseas For Warehouse Building? 
Yes, We Can Provide The Service Of Installation, Supervision, And Training By Extra. We Can Send Our Professional Technical Engineer To Supervise Installation On-Site Overseas. They Have Succeeded In Many Countries, Such As Iraq, Dubai, South Africa, Algeria, Malawi, Thailand, And Ghana. 

7.3 What Is Your Main Market? 
Guided By Global Field Of Vision, Our Products Have Been Exported To Many Countries And Regions With Its Good Quality And Good Service, Such As France, UAE, South East Asia, Africa And So On. We Will Be Glad To Establish Sincere Business Cooperation With You In The Near Future. 

7.4 How To Pack The Products? 
We Use A Standard Package. If You Have Special Package Requirements, We Will Pack As Required, But The Fees Will Be Paid By Customers. 

7.5 Can You Offer Designing Service? 
Yes, We Have More Than 100 Design Engineers. We Could Design Full Solution Drawings As Per Your Requirements. They Use Software: Auto CAD, PKPM, MTS, 3D3S, Search, Tekla Structures(X steel)V12.0. etc. 

8. How to Take Care of Your Steel Structure Workshop?

There are some notes for owners of steel structure workshop to maintain their buildings:

8.1. After the installation of steel structure buildings, the owners cannot change the structure and dismantle bolts or other components. If you need to change any part of the building, you must consult the manufacturer to see whether it can be changed.

8.2. The steel structure should be painted and maintained when it has been used for about 5 years so as to ensure a good-looking appearance and excellent safety.

8.3. In the use of electrical equipment, the wire and cable should be isolated by slot line pine in order to avoid electric shock accidents.

8.4. The steel structure workshop should be cleaned on a regular basis.

8.5. Any damage to the surface of metal panels shall be repaired in time to prevent rain and sun from corroding the metal plate.

The maintenance of a structural steel design workshop has a great deal to do with the service life of the building, so the owners should pay enough attention to it.

We are a professional material handling solution provider and supplies a variety of steel structure buildings, such as steel structure warehouse, steel structure shop and steel structure shed. To know more about the steel structure workshop, contact us now and get affordable steel workshop building prices.

9. Customized design is welcome, it would be better if you could provide the following information:

9.1. Location (where will be built?) _____country, area

9.2. Size:Length*width*height _____mm*_____mm*_____mm

9.3. Wind load (max.Wind speed) _____kn/m2, _____km/h, _____m/s

9.4. Snow load (max.Snow height) _____kn/m2, _____mm

9.5. Anti-earthquake _____level

9.6. Brickwall needed or not If yes, 1.2m high or 1.5m high

9.7. Thermal insulation If yes, EPS, fiberglass wool, Rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok.The cost of the latter will be much lower than that of the former.

9.8. Door quantity & size _____units, _____(width)mm*_____(height)mm

9.9. Window quantity & size _____units, _____(width)mm*_____(height)mm

9.10. Crane needed or not If yes, _____units, max.Lifting weight____tons;Max.Lifting height _____m

Welcome To Visit Our Factory, We Assure That Our Products Will Satisfy Your Needs With Designs, Competitive Performance Price Ratio, And Best Services. 

10. WHO ARE WE

Qingdao Vista Construction Engineering Co., Ltd. Located in Qingdao City, Shandong Province, China. With over 20 years of experience in steel structure design, manufacturing, marketing. Now, our business scope extends to high-quality steel structure buildings (such as warehouse, workshop, hangar, chicken house, etc. ), prefabricated buildings, prefab houses, container house, steel structural member, sandwich panels, glass curtain wall, decorative metal panels and so on.

We have professional steel structure engineering contracting the first-class qualification, with more than 50-year-limited warranty in steel building manufacturing & installation. We have professional engineers who can provide the perfect designs according to the customer's demand.
Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material
Environment Friendly Structural Steel Fabrication Modern Prefabricated Modular Shopping Mall Building Material

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours