Qingdao Dongfeng Warehouse Steel Structure Building Prefabricated Steel Structure Warehouse

Qingdao dfx storage warehouse steel structure building prefabricated steel structure warehouseChecking Cost Of steel structure, Please Give Us The Information(1) Dimension: Length, width, height, eave height, roof pitch, etc.(2) Doors and windows: Dimension, quantity, position.(3) Local climate: Wind speed, snow l

Featured Products

Qingdao dfx storage warehouse steel structure building prefabricated steel structure warehouse
Checking Cost Of steel structure, Please Give Us The Information
(1) Dimension: Length, width, height, eave height, roof pitch, etc.
(2) Doors and windows: Dimension, quantity, position.
(3) Local climate: Wind speed, snow load, seismic magnitude etc.
(4) Insulation material: Panel type, sandwich materials, sandwich thickness
(5) crane metal structures: if have overhead crane, please tell the lifting height and lifting weight.
(6) Is there any materials that are not allowed to import to the country where the structure is planning to use?
(7) If you have other requirements, such as fire proofing, insulated roof, etc. Please also inform us.
(8) It's better if you have your own drawings or pictures. Please send them to us.

steel structure workshop warehouse building main components.
1main steel frameQ235 Q345 steel H beam and comlumns, painted or galvanized, box steel, galvanized C section or steel pipe
2.Secondary frame :galvanized C or Z purlin , steel bracing , tie bar , knee brace , flashing etc.
.Roof panel :EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel or steel sheet
 Wall panel :Sandwich Panel or Corrugated Steel Sheet
 Tie Rod:Circular Steel Tube
 Brace:Round Bar
 Knee Brace:Angle Steel
 Roof Gutter:Color Steel Sheet or Galvalume sheet
 Rainspout:PVC Pipe
3.Door:Sliding Sandwich Panel Door or rolling Metal Door
 Windows:PVC or Aluminum Alloy Window
 Connecting:Anchor bolts, intensive bolt , galvanized machine bolt, self-drilling screws
4.Packing:according to the pack list made by our engineer
5.Drawing:We can supply structural steel engineering design and instalaltion drawing
 

Director Co.,Ltd is a China based manufacturer of steel structure building, prefabricated house and related steel products. Our products include the prefabricated house, steel structure building such as warehouse, workshop, dormitories, etc.) Container house, modular house, sandwich panels and so on. e have exported our products to over 40 different countries around the world. We have our own engineers who can provide the perfect designs according to the customers' demand.

We are an ISO9001 registered company, and we produce the products in Chinese National Standard, international standard, and customer's special request.
Qingdao Dfx Storage Warehouse Steel Structure Building Prefabricated Steel Structure Warehouse
Qingdao Dfx Storage Warehouse Steel Structure Building Prefabricated Steel Structure Warehouse


FAQ

1.Common type of the industrial building?
Reply:Portal frame is the usual type in the industrial workshop and warehouse shed.Other types also could be designed and manufacturer as per clients's equest.
2.What's the quality grade of the steel structure components?
Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure.
3.How about the delivery time?
Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabrication quantity.
4.How about the derust grade?
Reply:Ball blasting Sa2.5 on main steel structure manual derust St2.0 on secondary steel structure.
5.What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panl could be used.Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool and PU.
6.How to install it?
Reply: We will furnish you the detailed construction drawing and theconstr uctionmanual
which could help you to erect and install the building step by step.We also could send the engineer your local to help you if needed.
7.Maintenance:
Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.So the surface willstay m ore time.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours